Monday, June 19, 2006

The Dads




June 17, 2006
The Dads come over to help out for the day. Athol goes to work framing. With his lovely assistant Deborah, they put up the half-wall by the front door, and a 2x6’ post by the dining room pillar. After a short lunch break, they frame the stack in the bathroom and build the bathtub ledge.

Fred and Andrew measure and prep for the installation of some new bathroom floor boards. Then while Andrew heads to Home Depot for some supplies, Fred re-routes the wires for the kitchen light. Fred then installs the new bathroom floor boards and Andrew starts to frame the main floor outside wall for foam insulation.

0 Comments:

Post a Comment

<< Home