We tackle a little but learn a lot

July 5, 2006
We cut to size and install the duct output in the half-wall near the front door. We then continue drywalling that section, only to realize the wall is not level. Luckily the problem is a result of only one piece being out of place. We take off the drywall, reposition everything and we're rolling. As Deb screws the drywall into place she accidently goes through one of the electrical wires. The wires still function, and no electrical shocks were had!

0 Comments:
Post a Comment
<< Home